Where it stands as of Mon, Aug 17
The Planning Board reviewed expanded stormwater plans, instructed the applicant to submit a formal waiver request for sports lighting, and continued the hearing to September 14, 2026.
Every time it came up newest first
-
22 Turnpike Road site plan modification continued hearing
Engineer Peter Bemis presented revised site modification plans for 22 Turnpike Road responding to town peer review comments. The revisions double the size of an underground stormwater infiltration system and accommodate previously unpermitted patios and a storage shed. Board members reviewed lighting plans that exceed normal residential limits due to sports recreation use and directed the applicant to submit a formal waiver request.
- The stormwater infiltration system capacity was doubled to meet peer review standards.
- Plans were updated to document existing patios and a storage shed constructed behind the driving range.
- Lighting plans seek to replace metal halide fixtures with LEDs under commercial sports facility lighting standards.
- The applicant must file a formal lighting waiver letter citing sports lighting criteria before the next meeting.
Outcome: The public hearing was continued to September 14, 2026.