Where it stands as of Tue, Aug 4
The Stewardship Committee has authorized the use of pre-cut pressure-treated lumber for the Eagle Scout footbridge project in the Town Forest. The approval followed a review of findings indicating that modern treated wood poses minimal risk to the surrounding wetland and vernal pool. No further committee reviews or subsequent steps are currently scheduled.
- For Stewardship Committee Voted 4-0 on Aug 4 to approve using pre-cut pressure-treated wood, citing findings that modern treated lumber leaches minimal chemicals into wetlands.
Votes
| Date | Board | Motion | Result | Video |
|---|---|---|---|---|
| Stewardship Committee | Approve the use of treated wood for the Town Forest Eagle Scout footbridge project. Town Forest Eagle Scout footbridge | Passed4-0 | 23:48 |
Every time it came up newest first
-
Town Forest footbridge construction materials
The committee evaluated whether to proceed with pressure-treated lumber already purchased by the Trails Committee for an Eagle Scout footbridge project in the Town Forest or to substitute cedar. A member shared findings from the Conservation Commission indicating that modern pressure-treated wood leaches minimal copper and does not migrate significantly into soil or sensitive wetland areas.
- The project involves a footbridge near a vernal pool and wetland crossing in the Town Forest.
- Lumber was already pre-cut and aged outdoors over a season, reducing surface residue risks.
- Conservation Commission approved similar treated lumber for wetland crossings based on forestry research.
Outcome: Approved 4-0 to authorize the use of the pre-cut treated wood for the Eagle Scout project.