Where it stands as of Thu, Apr 2

The Conservation Commission unanimously approved an Order of Conditions on April 2, 2026, for the DPW's Lynbrook Road water main replacement project. Work remains subject to pre-construction submittals and dewatering reviews.

Votes

DateBoardMotionResultVideo
Conservation Commission Issue an Order of Conditions for the Lynbrook Road water main replacement project with special conditions as discussed. Lynbrook Road water main rehabilitation Passedunanimous 8:37
Conservation Commission Close the public hearing for the Notice of Intent for the Lynbrook Road water main replacement project. Lynbrook Road water main rehabilitation Passedunanimous 7:11
Conservation Commission Continue the public hearing for the Lynbrook Road water main replacement Notice of Intent to April 2, 2026 at 7:00 PM. Lynbrook Road water main rehabilitation Passedunanimous 29:12

Every time it came up newest first

  1. · Conservation Commission

    Lynbrook Road water main replacement Notice of Intent

    The commission reviewed revised engineering plans submitted by consultant Seaver Anderson on behalf of the Southborough Department of Public Works for replacing the water main within the Lynbrook Road right-of-way. Revisions clarified buffer zones, confirmed riverfront areas do not encroach into the work site, adjusted match lines, and substituted straw bales for hay bales in dewatering details. The commission closed the public hearing and voted to issue an Order of Conditions with requirements for contractor pre-construction plan submittals and dewatering reviews.

    • Project located in the Lynbrook Road right-of-way near Lovers Lane.
    • Revised plans stamped and dated March 30, 2026.
    • Special conditions require final design plans and dewatering setups to be reviewed and approved prior to work.
    • Public hearing closed and Order of Conditions approved unanimously.

    Outcome: Public hearing closed and Order of Conditions approved.

  2. · Conservation Commission

    Lynbrook Road water main rehabilitation NOI

    The Department of Public Works submitted a Notice of Intent to rehabilitate an aging water main running from Main Street through an easement along Interstate 495 to Lynbrook Road and Lovers Lane. Rather than open trench excavation through wetland areas, the project will use a cured-in-place pipe structural lining within the existing 12-inch asbestos-cement pipe.

    • Project limits stretch between Route 30 (Main Street) and Lovers Lane along Lynbrook Road.
    • Work in the buffer zone is limited to 280 square feet of excavation across temporary access pits spaced roughly 400 feet apart.
    • Lynbrook Road is technically a state highway, and the town is coordinating the project ahead of MassDOT repaving and transferring the road to the town.
    • The commission consultant requested clarifying details on dewatering protocols, erosion barriers, and perennial stream distances.
    • The hearing was continued to allow the applicant to provide revised plans and construction details.

    Outcome: Hearing continued to April 2, 2026 at 7:00 PM.